dong Nupidong 2 -

4.3 Nupindong 2 (Buffalo cave 2)
Zone 48 - 654496 2742561 Alt 940m
Survey contains 11 survey stations, joined by 10 shots.
There are 0 loops.
Total length of survey shots = 243.20m (243.20m adjusted)
Total plan length of survey shots = 241.29m Total vertical length of survey shots = 17.04m
Vertical range = 8.74m (from upin_dong_2.c6 at 948.74m to upin_dong_2.gps at 940.00m)
North-South range = 105.24m (from upin_dong_2.c10 at 2742561.97m to upin_dong_2.c3 at 2742456.73m)
East-West range = 164.96m (from upin_dong_2.gps at 654496.00m to upin_dong_2.c1 at 654331.04m)
1-nodes (qty 2)
2-nodes (qty 9)
A river cave that needs a boat to continue.

AUT. VAR. Collated by GED CAMPION (2001)
The YRC Guangxi Caves 2000 Expedition. The YRC Bulletin Summer 2001 64 p., 45 photos, 4 cartes, 8 topographies
Analyse : gkc-JPB
Résultat des explorations menéees au cours de l’expédition Guangxi Caves 2000 dans la province du Guangxi (Comtés de Leye et Lingyun).

652 caractères - Lu 118 Fois




Recherche